Revised electricity charges in Noida

When it comes to buying or renting a house, a number of buyers and tenants consider the cost of living in the city. One expense that forms a huge part of this cost are electricity charges. While rentals in Noida are lower than in Delhi, the electricity charges are way higher in Noida.

What are the new electricity charges and tariffs?

Earlier, the Uttar Pradesh (UP) government has increased the electricity tariffs across all categories, be it residential or agricultural/commercial properties. The increase in the tariffs was around 12 to 15 percent on average. However, the regulatory surcharge of 4.28 percent was abolished. Therefore, an effective tariff hike was around 7.4 percent.

The tariffs for urban domestic consumers have been increased from Rs 4.90 per unit to Rs 5.50 per unit for first 150 units of consumption. For 151-300 units of electricity consumption, rates have been revised from Rs 5.40 per unit to Rs 6 per unit. The tariffs have been revised from Rs 6.20 to Rs 6.50 per unit on 301 to 500 units, and from Rs 6.50 to Rs 7 per unit for units consumed above 500.

 The current rate chart for electricity charges for residential properties is as follows-

HeadsCharges
Fixed charges (Rs/kW/Month)Rs 110
Upto 150 kWh/month (Rs /kWh)Rs 5.50
151-300 kWh/month (Rs /kWh)Rs 6
301-500 kWh/month (Rs /kWh)Rs 6.50
Above 500 kWh/month (Rs /kWh)Rs 6.50

Charges for metered consumers (All loads)Source: Noida Power Company Limited

The rate of power supplied to single-point connections in apartments has also been increased from the current Rs 6.10 to Rs 7. However, the charges for multi-point supply will remain the same as that of other domestic consumers. 

The consumers using prepaid meters will be eligible for a two percent discount on the tariffs. This has been done to increase the cash flow to the electricity companies.

Major concerns of Noida residents from NPCL

Installation of dual meters 

One of the major issues of the tussle between the residents and the developers was a single point connection system. In this system, the developer would take one connection for the whole society and realise tariffs from each flat owner. In this case, the flat owners ended up paying significantly more charges than the actual units of electricity used.

The residents have been demanding a multi-point electricity connection to each flat so that each flat owner can pay according to their own consumption pattern. After raising the concerns at various forums, the demand was met only recently.

Commenting on the issue of dual meter installation, Niazi Hasan, Estate Manager, Logix Blossom County, Noida, says, “Even the builder fraternity was keen on the installation of the dual metering system. The single point connection system put the burden of providing electricity on developers, which was very hassle riddled and resource consuming. Now that each flat has its own connection under multi-point connection system, the responsibility of the builder has reduced. It is also beneficial for the consumers as they pay only for the amount of electricity they consume.”

Over-reliance on diesel generators 

It was observed that many societies in and around Noida were relying on diesel generators for regular power supply and power backups. Builders charge exorbitantly high charges for the electricity and backup, and the residents are left with no option but to comply. The Resident Welfare Associations (RWA) and citizens’ delegations have complained to the regulatory authority and sought grievance redressal. Along with being disadvantageous to the residents, it is also harmful to the environment.

In a nutshell, there must be a balance between the increase in electricity tariffs and consumer interests. A thorough consultation and feedback incorporation can be very helpful in this regard. Although the electricity tariffs might have been increased to improve the electricity distribution network, and ensuring continuous power supply in rural areas, a predictive policy regime and a collaborative approach of the government will benefit all stakeholders.

NPCL emergency and helpline number

Residents of Noida can use following contact details to reach out to Noida Power Company Limited:

Helpline: 0120 6226666/ 2333555/ 888

Emergency number: +91-9718722222

NPCL latest announcements and updates

NPCL has come out with a list of societies where single point electricity connection will be converted into multi-point individual connections in the coming months. Here’s the complete list:

SOCIETY / CONSUMER NAME; ADDRESSEstimated Time for Conversion
AMBE BHARTI PATRAKAR SAS LTD.; PLOT NO.-9, SECTOR-32 PI1 Month 
EDANA; INOX AIR PRODUCTS PVT. LTD. (GROUP HOUSING); PLOT NO.-GH-04, SECTOR-ALPHA-12 Months 
AIG PARK AVENUE; AIG INFRATECH (INDIA). PVT. LTD.; PLOT NO. GC-02/GH-01, SECTOR-42 Months 
ANAND ASHRAY; C.C.S.E. SAHAKARI  AWAS SAMITI  LTD.; PLOT NO.-GH-007A, SECTOR-PHI-022 Months 
HINDUSTAN PETROLIUM COOPERATIVE HOUSING; PLOT NO.-14, SECTOR-32 PI2 Months 
POWER OFFICERS SAHAKARI AWAS SAMITI; PLOT NO 14, POCKET P22 Months 
NRI CITY (PLOTTED); OMAXE LTD; PLOT NO.-GH-001, SECTOR-OMEGA-13 Months 
KENDRIYA LOKNIRMAN SAS LTD.; PLOT NO.-10, POCKET P43 Months
MEENAKSHI SAHAKARI AWAS SAMITI; PLOT NO.-7, SECTOR-32 PI3 Months
PRASAR KUNJ SAHAKARI AWAS SAMITI; PLOT NO.-8, SECTOR-32 PI3 Months
BANK EMPLOYEE SAS LTD.; PLOT NO 1, SECTOR-32 PI3 Months
SAYA ZION; SAYA BUILDCON CONSORTIUM PVT. LTD.; GH-01, SECTOR-43 Months
ECOVILLAGE-1; SUPERTECH LTD.; GH-08, SECTOR-1 (Partially Completed Project)4 Months
ACE CITY; CREST PROMOTERS PVT. LTD.; PLOT NO.-GH-01, SECTOR-14 Months
GRAND FORT; SATILILA SAS LTD.; PLOT NO.-76, SECTOR-SIGMA-42 Months
SPRING MEADOWS; PIGEON BUILDHOME PVT. LTD.; GH-07A, SECTOR-TECHZONE-43 Months
ECOVILLAGE-2; SUPERTECH LTD.; GH-01, SECTOR-16B (Partially Completed Project)4 Months 
ELDECO MYSTIC GREEN; ELDECO INFRASTRUCTURE PVT. LTD.; PLOT NO.-GH-003, SECTOR- OMICRON-I3 Months
CZAR; SUPERTECH LTD.; GH-02, SECTOR-OMICRON-1 (Incomplete elect. Infra)4 Months 
ATS DOLCE; DOMUS GREEN PVT. LTD.; PLOT NO.-GH-12A, SECTOR-ZETA-I (Ph-II Under Construction)3 Months
FRENCH APARTMENTS; ANTHEM INFRASTRUCTURE PVT LTD.; PLOT NO.-GH-07B, SECTOR-16B 3 Months
SAMRIDHI GRAND; SAMRIDHI REALTY HOMES PVT. LTD.; PLOT NO.-GH-09D, SECTOR-TECHZONE-43 Months
HIMALAYA PRIDE; HIMALAYA REALESTATE PVT. LTD.; GH-10B, SECTOR-TECHZONE-4 4 Months
PANCHSHEEL HYNISH; PANCHSHEEL BUILDTECH PVT.LTD.; PLOT NO.-GH-08A, SECTOR-14 Months
VALENCIA HOMES; PLOT NO.-GH-07B, SECTOR-1 3 Months
SAVIOUR GREEN ARCH; NEW WAY HOMES PVT. LTD.; PLOT NO.-GH-10A, SECTOR-TECHZONE-43 Months 
NIRAL ASPIRE; NIRALA HOUSING PVT. LTD.; PLOT NO. GH-03, SECTOR 16 3 Months 
10TH AVENUE, GAUR CITY -2; GAURSONS PROMOTERS PVT.LTD.; PLOT NO.-GC-10/GH-3, SECTOR-16C3 Months 
GALAXY VEGA; PANCH TATVA PROMOTERS PVT. LTD.; PLOT NO.-GH-08C, SECTOR-TECHZONE-43 Months 
PANCHSHEEL GREENS; PANCHSHEEL BUILDTECH PVT.LTD. (GREENS); PLOT NO.-GH-001A, SECTOR-16B4 Months
GALAXY NORTH AVENUE-II; GALAXY DREAM HOME DEVELOPERS; PLOT NO.-GC/3D, GH-3, SECTOR-16C4 Months 
1ST AVENUE, GAUR CITY -1; GAURSONS HI TECH INFRASTRUCTURE PVT. LTD.; PLOT NO.-GC-01/GH-1, SECTOR-43 Months 
PRISTINE AVENUE; GEOTECH HOMZ PVT. LTD.; PLOT NO.-GC-3F/GH-3, SECTOR-16C3 Months 
STELLAR MI CITIHOMES; SPRINGLEA DEVELOPERS PVT. LTD.; PLOT NO.-GH-07A, SECTOR-OMICRON-III, 3 Months 
PARSVNATH ESTATE RESIDENT WELFARE ASSOCIATION; PLOT NO.-BRS-08, POCKET P23 Months 
PALM OLYMPIA; SAM INDIA ABHIMANYU HOUSING; PLOT NO.-GH-02, SECTOR-16C3 Months 
14TH AVENUE, GAUR CITY -2; GAURSONS PROMOTERS PVT. LTD.; PLOT NO.-GC-14/GH-3, SECTOR-16C3 Months 
ARIHANT AMBER; CITYCON BUILDWELL PVT LTD; GH-16C, SECTOR-013 Months 
FUSION HOMES; FUSION BUILDTECH PVT. LTD.; PLOT NO.-GH-05A,SECTOR-TECHZONE-43 Months 
TRIDENT HOMES; TRIDENT INFRAHOMES PVT. LTD.; PLOT NO.-GH-05B, SECTOR-13 Months 
SKA GREEN MANSION; SKA REALTECH PVT. LTD.; PLOT NO.-GH-01N, SECTOR-123 Months 
AJNARA HOMES; APV REALTY LTD.; PLOT NO.-GH-003, SECTOR-16B5 Months 
SKY GARDEN; SJP INFRACON LTD.; PLOT NO.-GH-05, SECTOR-16B4 Months 
AISHWARYAM; WALL ROCK INFRATECH PVT. LTD.; PLOT NO.-GC-3G/GH-3, SECTOR-16C3 Months 
DIVYANSH FLOURA; DIVYANSH INFRA HEIGHT PVT. LTD.; PLOT NO.-GC-3H/GH-3, SECTOR-16C3 Months 
EROS SAMPOORNAM; AJAY ENTERPRISES PVT. LTD.; PLOT NO.-GH-01, SECTOR-24 Months 
OMKAR ROYAL NEST; OMKAR NESTS PVT. LTD.; PLOT NO.-GH-08B, SECTOR-TECHZONE-44 Months 
ACE ASPIRE; STAR LANDCRAFT PVT. LTD.; PLOT NO.-02A,ECTOR-TECHZONE-43 Months 
ALPHA HOMES; MSX REALTORS PVT.LTD.; PLOT NO.-GH-010, SECTOR-ALPHA-13 Months 
AMRAPALI GRAND; BIHARIJI ISPAT UDYOG LTD.; PLOT NO.-GH-009, SECTOR- ZETA-I3 Months 
AIR FORCE NAVAL HOUSHING BOARD; PLOT NO.-9, BUILDERS SCHEME3 Months 
EXPRESS PARK VIEW-1; NIMBUS PROJECTS LIMITED; PLOT NO.-10B, SECTOR-CHI-053 Months 
IITL NIMBUS THE EXPRESS PARK VIEW; PLOT NO.-GH-003, SECTOR-CHI-053 Months 
EXPRESS PARK VIEW-1; IITL PROJECTS LIMITED; PLOT NO.-GH-010A, SECTOR-CHI-053 Months 
CASA GRAND 1; EARTHCON CONSTRUCTION PVT.LTD.; PLOT NO.-GH-07A, SECTOR-CHI-053 Months 
PLUMERIA GARDEN; UP TOWN SHIP PVT. LTD.; PLOT NO.-GH-001, SECTOR-OMICRON-III3 Months 
UNITECH HEIGHT; PLOT NO.-5,SECTOR-CHI-033 Months 
UNITECH VERVE; PLOT NO.-11, SECTOR-32 PI,PI-023 Months 
CASA WOODSTOCK; ANGEL INFRAHEIGHT PVT LTD.; GC-3E/GH-03, SECTOR-16C3 Months 
UNITECH CASCADE; PLOT NO.-8, SECTOR-32PI3 Months 
AMRAPALI CASTLE; ULTRA HOME CONSTRUCTION PVT.LTD.; GH-04A, SECTOR-CHI-53 Months 
PLATINUM APARTMENTS RESIDENTS WELFARE ASSOCIATION.(PARWA); PLOT NO.-D-001(TAU), SECTOR-313 Months 
PARASDEEP SAHAKARI AWAS SAMITI; PLOT NO.-GHS-04, SECTOR-32 PI3 Months 
MAHAGUN MY WOODS; MAHAGUN (INDIA) PVT.LTD.; PLOT NO.-GH-04, SECTOR-16C5 Months 
VEDANTAM; JYOTIRMAY INFRACON PVT. LTD.; PLOT NO.-GH-01B, SECTOR-16C3 Months 
GOLF GARDENIA; M.I.BUILDERS PVT. LTD; PLOT NO.-GH-002, SECTOR-ALPHA-23 Months 
PARSVANATH EDENS; EDENS FLAT OWNERS & RESIDENTS ASSOCIATION; PLOT NO.-GHS-05, SECTOR-ALPHA-23 Months 
OASIS HOMES; IDEAL REALTY SOLUTIONS PVT. LTD.; PLOT NO-91, SECTOR-BETA-23 Months 
OMAXE PALM GREENS; OMAXE BUILD HOME PVT. LTD.; PLOT NO.-GH-002, SECTOR-MU3 Months 
PARSVNATH PANORAMA; PLOT NO.-A-001, SWARN NAGRI3 Months 
NRI RESIDENCY; SDS INFRATECH PRIVATE LIMITED; PLOT NO.-GH-001, SECTOR-OMEGA-23 Months 
UNITECH HABITAT; PLOT NO.-9, SECTOR PI-023 Months 
NIRALA GREENSHIRE; NIRALA PROJECTS PVT LTD ; GH-03, SECTOR-24 Months 
PURVANCHAL SILVER CITY-II; RWA PURVANCHAL SILVER CITY-II; PLOT NO.-10, SECTOR-PHI-023 Months 
MAHALUXMI GREEN MANSION; MAHALUXMI BUILDTECH LIMITED; HRA-14, SECTOR-SITE-C3 Months 
SHIVALIK HOMES; COSMOS INFRAESTATE PVT.LTD.; PLOT NO.-HRA-009, SITE C SURAJPUR HOUSING3 Months 
5TH AVENUE,GAUR CITY -1; GAURSONS HI-TECH INFRASTRUCTURE PVT .LTD; PLOT NO.-GC-05/GH-1, SECTOR-4 3 Months 
6TH AVENUE,GAUR CITY -1; GAURSONS HI-TECH INFRASTRUCTURE PVT.LTD.; PLOT NO.-GC-6/GH-1, SECTOR-4 3 Months 
LA RESIDENTIA; LA RESIDENTIA DEVLOPERS PVT. LTD.; PLOT NO-GH-06A,SECTOR-TECHZONE-44 Months 
ACE PLATINUM; STAR CITY BUILDCON PVT. LTD.; PLOT NO.-GH-012/1, SECTOR-ZETA-I4 Months 
PUTTING GREENS; OMAXE LTD.; PLOT NO.-GH-002, POCKET P23 Months 
VICTORY ONE CENTRAL; INTELLECT PROJECTS PVT LTD; GH-02E, SECTOR-12 (Partially Complete Project)Under Construction
PANCHSHEEL GREENS-II; PANCHSHEEL BUILDTECH PVT. LTD.; PLOT NO.-GH-01A, SECTOR-16Under Construction
AJNARA LEE GARDEN; AJNARA REALTECH LTD.; PLOT NO. GH 02, SECTOR 16C (Partially Complete Project)4 Months 
ECOVILLAGE-3; SUPERTECH LIMITED; PLOT NO.-GH-06, SECTOR-16B (Partially Complete Project)6 Months 
ANS APARTMENTS PVT. LTD.; PLOT NO.-10, SECTOR-33 PI-1&2Under NCLT
TODAY HOMES & INFRASTRUCTURE PVT. LTD.; PLOT NO.-BRS-07, SECTOR-OMEGA-1Under NCLT
AVJ HEIGHTS; AVJ DEVELOPERS PVT. LTD.; GH-012/2, SECTOR ZETA-1 Under NCLT
JAYPEE GREENS; JAYPEE GREENS LTD.  (Mixed Load)6 Month
LOTUS VILLA; RENOWNED BUILDTECH PVT. LTD.; K.N. 215-234, JALPURA2 Months 
LOTUS PARK; RENOWNED BUILDTECH PVT.LTD.;  K.N. 258-268, SURAJPUR2 Months 

How to pay NPCL electricity bill?

Noida residents can pay electricity bill to NPCL online as well as offline. There are multiple cash collection centre and cheque dropbox for the ease of consumers. The bill can be paid online on Noidapower.com and through NEFT and RTGS. Here are the bank details for the online transfer:

Beneficiary Account No: NPCLTDXXXXXX
‘xxxxxx’ should be Customer’s Contract Account Number as mentioned on Bill.

Beneficiary Name: NOIDA POWER COMPANY LIMITED
Beneficiary Address: Electric Sub-station, Knowledge Park – IV, Greater Noida, Gautam Buddha Nagar, UP – 201310

Bank Name: HDFC BANK LTD
Branch Name: Sandoz Branch, Mumbai
IFSC Code: HDFC0000240

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top